Subgrade
Strip, cut and compact the formation. Everything above only performs if the ground beneath is proof-rolled and signed off.
Every carriageway is a stack of engineered layers. Scroll to watch one go down, in the order we actually build it on site.
Strip, cut and compact the formation. Everything above only performs if the ground beneath is proof-rolled and signed off.
Graded aggregate laid and compacted to level. This is the layer that spreads load and keeps water moving away from the formation.
The structural course. Laid to tight tolerance, rolled to density, and tested before anything gets surfaced.
Binder and wearing course, paved hot and rolled to a sealed, even running surface.
Kerb line, edge lines and centre markings. The road stops being earthworks and starts being a road.
Cut, fill, haul and compaction to formation level.
Supply, lay and compact graded aggregate to spec.
Reinforced concrete structures, culverts and hardstandings.
Kerb line, channels and connection into the drainage network.
Send us the scope, drawings and programme. We will come back with what we can mobilise.
Start a conversation